Gantry laser setup and commissioning
Commissioning for most CO2 and diode gantry systems, from first alignment to a tested material library.
What is included
- Mirror and lens alignment checked through the full optical path
- Bed leveling and focus calibration
- Air assist, exhaust, and water cooling verified before material testing
- Power and speed test grids on your materials, saved as a library
- A written commissioning summary, including maintenance checkpoints
What we need from you
A laptop connected to the machine, a phone or camera for the optical path and bed, and offcuts of the materials you plan to run.