What is included

  • Mirror and lens alignment checked through the full optical path
  • Bed leveling and focus calibration
  • Air assist, exhaust, and water cooling verified before material testing
  • Power and speed test grids on your materials, saved as a library
  • A written commissioning summary, including maintenance checkpoints

What we need from you

A laptop connected to the machine, a phone or camera for the optical path and bed, and offcuts of the materials you plan to run.

Request a consultation